Skip to content

Home / Job sites / Winterthur

Corporate housing for assignments in Winterthur.

Two locations on the German side of the Rhine, 28 minutes to Winterthur. Also for Töss, Neuhegi and Effretikon.

Nearest location
Jestetten
Largest location
40 people
Capacity
58 people
Price from
25 €

The situation

The crew stays together

Large crews stay together here, up to 40 people at one address instead of spread over three hotels in two districts. For the site manager that means one departure time, one vehicle, one invoice.

Whole flats

Kitchen, washing machine, own bathroom. Art. 3 of the German Posted Workers Act requires accommodation of a locally customary standard, more under Standards and compliance.

Parking at the door

Vans included, and enough spaces for several vehicles. In Winterthur parking is managed; here the vehicle stands outside the door.

Priced in euros

You pay in euros to a German contracting party. Utilities included, VAT shown separately, one collective invoice per month.

Getting there

Drive times to Winterthur

Drive time in minutes from our two locations to Winterthur. Early on a weekday, towards the job site.
LocationUnitsTo Winterthur
Jestettenrooms.28
HohentengenVilla Rheinblick, Petite Rheinblick35

Our locations in Waldshut, Lauchringen and Kadelburg are more than an hour from Winterthur in rush hour traffic, which is why they are not in this table. The route runs over the crossings at Jestetten, Kaiserstuhl and Eglisau, all open around the clock and as a rule without waiting. For registering your people in Switzerland the eight day notification rule, and for the posting itself the A1 certificate.

Winterthur region

Projects under way

With the railway expansion, Winterthur has a site that runs longer than any housing project in the region.

Infra­structure

Four-track expansion to 2037

The upgrade of the line to Zurich runs at around 3.3 billion francs over more than ten years, partly on night shifts. Töss station and the 800 metre bridge at the Neumühle start in 2027, tunnelling in 2029.

Housing

Lokstadt

On the site of the former locomotive works, the last stage of a quarter built in phases over around ten years is under way. Two halls are being fitted out, and for the tower on the final plot the start is announced for 2027 and completion for 2030.

Industry

Neuhegi and Grüze

The east of the city is home to mechanical and plant engineering, plus building services and maintenance in existing buildings. These assignments are smaller than the railway sites, but they often last months and are extended without a new contract.

On assignment

What the accommodation is built for

Access around the clock

Arrival late at night or early in the morning, with no reception desk and nothing to arrange. Access works whatever the hour and whatever the day.

Floor plan up front

Every unit page carries its floor plan. You see how the rooms are laid out before you book, and there is nothing left to settle on arrival.

Cleaning by arrangement

Dates by arrangement rather than on a fixed weekday. It is always the same people, our own staff, never a changing outside firm in an occupied unit. Cleaning is invoiced separately, as a rule every two weeks.

Suited to Winterthur

These units are closest

Exactly two locations come into question for Winterthur. Jestetten carries a large crew at one address, Hohentengen two flats for nine people each.

You will find all units in the overview, with floor plan, fittings and drive time from each location.

Accommodation for your assignment in Winterthur?

Headcount, dates, job site. You get a calculated quote with availability and a fixed price, not a price list.

Capacity for September and October can still be reserved.
Occupancy of individual units on request.

Send an enquiry
rheinblick rheinblick Reach us directly: +49 156 7838 2051 · WhatsApp · info@rheinblick.de